![]() Schedule: From 4:00am to 12:00am on weekdays, 6:00am to 12:00am on Saturdays and from 8:00am to 12:00am on Sundays.This line ends up at the Millbrae station after 9:00pm on weekdays and on weekends while before that time it finishes at the station connected to San Francisco’s international airport. ![]() This line has 26 stations operating Contra Costa, Alameda, San Francisco and San Mateo counties, therefore connecting the cities of Pittsburg, Bay Point, Concord, Pleasant Hill, Walnut Creek, Lafayette, Orinda, Oakland, San Francisco, Daly City, Colma, South San Francisco, San Bruno and Millbrae. Powell and Hyde San Fran Cable Car Pittsburg/Bay Point–SFO/Millbrae line: Oakland City Center, Lake Merritt (Oakland), Fruitvale (Oakland), Coliseum, San Leandro, Bay Fair (San Leandro), Hayward, South Hayward, Union City, Fremont, Warm Springs Stations: Richmond, El Cerrito del Norte, El Cerrito Plaza, North Berkeley, Downtown Berkeley, Ashby (Berkeley), MacArthur (Oakland), 19th St. Schedule: From 4:00am to 12:00 am on weekdays, 6:00am to 12:00am on Saturdays and from 8:00am to 12:00am on Sundays.This line ends in the Fremont terminal on weekdays before 6:00pm and on Warm Springs/South Fremont after 6 and on weekends. Its 19 stations are located in the Contra Costa and Alameda counties, connecting the cities of Richmond, El Cerrito, Berkeley, Oakland, San Leandro, Hay Ward, Union City and Fremont. Richmond–Warm Springs/South Fremont line:Ĭommonly known as the East Bay or Land Line, this one was the first to start operating and is the only main line that does not pass by the San Francisco Bay Area. Four of the six metro lines change terminals at a specified hour so as to offer an available transport system at each and every station during the whole schedule. Of the 46 stations 16 can be found on the surface, 14 on elevated platforms and 15 underground. This railway system is still in a state of constant expansion and one of the biggest projects currently underway is an extension of the metro system to Silicon Valley.Īs a whole, BART has a 180 kilometers length, 45 km of which go underground while 32 km runs on elevated platforms. Later on it was expanded in different stages until it reached Pittsburg in 1996, Dublin/Pleasanton in 1997, San Francisco’s international airport in 2003 and Oakland’s international airport in 2014. The construction of the BART project started in 1964, opening the first line between MacArthur and Fremont in 1972. This tunnel is known in the present day as the Transbay Tube. For this reason, the solution would become a complex but efficient engineering project that would include an underwater tunnel that would be used exclusively by the metro system. One of the principal needs was to connect Oakland to San Francisco in order to clear the congestion made in Bay Bridge. This entity would be the one in charge of the project and would originally include the counties of Alameda, Contra Costa, San Francisco, San Mateo and Marin but San Mateo county desisted on being part of the project, forcing Marin County to do the same. The idea of a metro system for the San Francisco Bay area started with the creation of Bay Area Rapid Transit District.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |